Operate pile drivers mounted on skids, barges, crawler treads, or locomotive cranes to drive pilings for retaining walls, bulkheads, and foundations of structures, such as buildings, bridges, and piers.
Also includes
Primary Industry | Architecture and Construction |
Indiana Average Salary | |
Average Time to Fill | 46 days |
Typical Education | High school equivalency |
Typical Experience | Over 1 year, up to and including 2 years |
Current Openings | |
2 Year Projected Openings (2022-2024) | |
2 Year Expected Percentage Change (2022-2024) | 4.04 % |
10 Year Projected Openings (2021-2031) | 36 |
10 Year Expected Percentage Change (2021-2031) | 13.39 % |
For more information on the new projection methodology, visit Hoosiers by the Numbers .
Skill or Certification | Certi - fication | Certification | Hard to Fill | Expensive to Fill |
---|---|---|---|---|
Front End Loaders | ||||
Machine Operation | ||||
Boilers | ||||
Materials Moving | ||||
Purchasing | ||||
Water Treatment | ||||
Hoisting Equipment |